Q: We have implemented a program to test electricity meters that are already in use. This would target approximately 28,000 electricity meters that have been in operation for more than 15 years. Under this program, we plan to test a sample of meters and come to a conclusion about the whole batch — whether replacement is required or not. As per ANSI/ISO/ASQ 2859-1:1999: Sampling procedures for inspection by attributes — Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection, we have selected a sample of 315 to be in line with the total number of electricity meters in the batch.
Please advice us on how to select an appropriate acceptable quality level (AQL) value to accurately reflect the requirement of our survey and come in to a decision on whether the whole batch to be rejected and replaced. Thank you.
DDJ-T1 Map for djay I've just created a DDJ-T1 MIDI map for Algoriddim's djay software - it's a basic start but covers the majority of what beginners would want to use. Disclaimer: Until Algoriddim or Pioneer officially releases a MIDI map, my map will be considered beta and you are using it without warranty, or guarantee of function. DDJ-T1: Notification; Software Download; Software Info; FAQ; Manuals; prev. Software Download. Driver Software; Setting File for TRAKTOR PRO 2 -Pioneer is a. Pioneer ddj- t1 djay 2. For instructions on installing and activating, see the TRAKTOR Pioneer DDJ-T1 Edition 2-compatible DDJ-T1 operating instructions. 5) When TRAKTOR 2 is first launched, a screen asking you to confirm whether or not to import the data you were using with TRAKTOR appears. Select one of the following, as required: If you want to import the data: COPY. The DDJ-T1 offers the same operability and layout as our pro-DJ equipment, whilst enabling DJs to play music files from the computer via dedicated TRAKTOR DDJ-T1 edition software (which is included). DDJ-T1 edition 1.2.8 users can update to version DDJ-T1 edition 2.0.1 (July 2011) for free. Description This Setting File is required when using Native Instruments' TRAKTOR PRO 2 with the DDJ-T1. It allows you to control the TRAKTOR PRO 2 sample decks with your DDJ-T1.
Sampling procedures for inspection by attributes Part 3: Specification for skip-lot sampling procedures. BS 6001-4:2005 (ISO 2859-5:2005) Sampling procedures for inspection by attributes Part 4: System of sequential sampling plans indexed by acceptance quality limit (AQL) for lot-by-lot inspection. International Standard ISO 2859/2was prepared by Technical Committee ISO/TC 69, Applications of statistical methods. It replaces, in part, the first edition of ISO 2859, published in 1974.
A: One of the least liked phrases uttered by statisticians is 'it depends.' Unfortunately, in response to your question, the selection of the AQL depends on a number of factors and considerations.
If one didn't have to sample from a population to make a decision, meaning we could perform 100% inspection accurately and economically, we wouldn't need to set an AQL. Photo light pro free download full version with crack. Likewise, if we were not able to test any units from the population at all, we wouldn't need the AQL. It's the sampling and associated uncertainty that it provides that requires some thought in setting an AQL value.
Kingroot v4 8.2 for android download. Source for this file is XDA. Works well with Lollipop. What's new in KingRoot Apk V 4.9.7?.
As you may notice, the lower the AQL the more samples are required. Think of it as reflecting the size of a needle. A very large needle (say, the size of a telephone pole) is very easy to find in a haystack. An ordinary needle is proverbially impossible to find. If you desire to determine if all the units are faulty or not (100% would fail the testing if the hypothesis is true), that would be a large needle and only one sample would be necessary. If, on the other hand, you wanted to find if only one unit of the entire population is faulty, that would be a relatively small needle and 100% sampling may be required, as the testing has the possibility of finding all are good except for the very last unit tested in the population.
AQL is not the needle or, in your case, the proportion of faulty fielded units. It is the average quality level which is related to the proportion of bad units. The AQL is fixed by the probability of a random sample being drawn from a population with an unknown actual failure rate of the AQL (say 0.5%), creating a sample that has a sample failure rate of 0.5% or less. We set the probability of acceptance relatively high, often 95%. This means if the population is actually mostly as good as or better than our AQL, we have a 95% chance of pulling a sample that will result in accepting the batch as being good.
The probability of acceptance is built into the sampling plan. Drafting an operating characteristic curve of your sampling plan is helpful in understanding the relationship between AQL, probability of acceptance, and other sampling related values.
Now back to the comment of 'it depends.' The AQL is the statement that basically says the population is good enough – an acceptable low failure rate. For an electrical meter, the number of out of specification may be defined by contract or agreement with the utility or regulatory body. As an end customer, I would enjoy a meter that under reports my electricity use as I would pay for less than I received. The utility company would not enjoy this situation, as it provides their service at a discount. And you can imagine the reverse situation and consequences. Some calculations and assumptions would permit you to determine the cost to the consumers or to the utility for various proportions of units out of specification, either over or under reporting. Balance the cost of testing to the cost to meter errors and you can find a reasonable sampling plan.
Besides the regulatory or contract requirements for acceptable percent defective, or the balance between costs, you should also consider the legal and publicity ramifications. If you accept 0.5% as the AQL, and there are one million end customers, that is 5,000 customers with possibly faulty meters. What is the cost of bad publicity or legal action? While not likely if the total number of faulty units is small, there does exist the possibility of a very expensive consequence.
Another consideration is the measurement error of the testing of the sampled units. If the measurement is not perfect, which is a reasonable assumption in most cases, then the results of the testing may have some finite possibilities to not represent the actual performance of the units. If the testing itself has repeatability and reproducibility issues, then setting a lower AQL may help to provide a margin to guard from this uncertainty. A good test (accurate, repeatable, reproducible, etc.) should have less of an effect on the AQL setting.
In summary, if the decision based on the sample results is important (major expensive recall, safety or loss of account, for example), then use a relatively lower AQL. If the test result is for an information gathering purpose which is not used for any major decisions, then setting a relatively higher AQL is fine.
If my meter is in the population under consideration, I am not sure I want my meter evaluated. There are three outcomes:
- The meter is fine and in specification, which is to be expected and nothing changes.
- The meter is overcharging me and is replaced with a new meter and my utility bill is reduced going forward. I may then pursue the return of past overcharging if the amount is worth the effort.
- The meter is undercharging me, in which case I wouldn't want the meter changed nor the back charging bill from the utility (which I doubt they would do unless they found evidence of tampering).
As an engineer and good customer, I would want to be sure my meter is accurate, of course.
Fred Schenkelberg
Voting member of U.S. TAG to ISO/TC 56
Voting member of U.S. TAG to ISO/TC 69
Reliability Engineering and Management Consultant
FMS Reliability
http://www.fmsreliability.com
Iso 2859-4 Sampling Standard
For more on this topic, please visit ASQ's website.
ISO 2859-1:1989This standard has been revised by ISO 2859-1:1999
General information
- Publication date : 1989-08
- Number of pages : 67
- :
- ICS :
Life cycle
A standard is reviewed every 5 years
- 30Committee
- 40Enquiry
- 50
- 60Publication
- 90Review
- 95.99Withdrawal
Iso 2859 Sampling Standard
Revisions / Corrigenda
- Previously
ISO 2859:1974 - Now withdrawn
ISO 2859-1:1989 - Corrigenda/Amendments
ISO 2859-1:1989/Cor 1:1993 - Revised by
ISO 2859-1:1999
Iso 2859 Sampling Standards
- The meter is fine and in specification, which is to be expected and nothing changes.
- The meter is overcharging me and is replaced with a new meter and my utility bill is reduced going forward. I may then pursue the return of past overcharging if the amount is worth the effort.
- The meter is undercharging me, in which case I wouldn't want the meter changed nor the back charging bill from the utility (which I doubt they would do unless they found evidence of tampering).
As an engineer and good customer, I would want to be sure my meter is accurate, of course.
Fred Schenkelberg
Voting member of U.S. TAG to ISO/TC 56
Voting member of U.S. TAG to ISO/TC 69
Reliability Engineering and Management Consultant
FMS Reliability
http://www.fmsreliability.com
Iso 2859-4 Sampling Standard
For more on this topic, please visit ASQ's website.
ISO 2859-1:1989This standard has been revised by ISO 2859-1:1999
General information
- Publication date : 1989-08
- Number of pages : 67
- :
- ICS :
Life cycle
A standard is reviewed every 5 years
- 30Committee
- 40Enquiry
- 50
- 60Publication
- 90Review
- 95.99Withdrawal
Iso 2859 Sampling Standard
Revisions / Corrigenda
- Previously
ISO 2859:1974 - Now withdrawn
ISO 2859-1:1989 - Corrigenda/Amendments
ISO 2859-1:1989/Cor 1:1993 - Revised by
ISO 2859-1:1999
Iso 2859 Sampling Standards
Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)
Keep up to date with ISO
Sign up to our newsletter for the latest news, views and product information.